Archive for September, 2009

2010 Labor and Material Cost Guides

Tuesday, September 29th, 2009

 2010-BNI-Sweets-CostGuides

Labor, materials, and equipment prices have been calculated from the average cost of actual jobs completed in 1000s of locations nationwide and presented in CSI MasterFormat — the industry standard for estimating.

With these valuable resources, you’ll be able to accurately calculate overhead, profit, and productivity rates.

A handy geographical conversion table is included for adjusting local costs.

>> http://www.licensedelectrician.com/Store/Cost_Guides.htm